The Minister of Transportation, Rotimi Amaechi, on Friday said the groundbreaking of the Transport University, Daura, would take place in Septemeber.
Amaechi disclosed this while inspecting Lagos -Ibadan rail line construction.
The minister said the ministry would also establish a factory in Kajola, Ogun, to produce materials for the rail project.
He said: “We have agreed with contractors handling the university and the rail line to have the groundbreaking between September and October for the two projects.”
He said the federal government was expecting contractors handling key road projects to hasten work to eliminate gridlocks, especially in Apapa area, Lagos.
He said the completion of the rail project would reduce gridlocks in Apapa and other parts of Lagos.
The minister said the fasctory to be built at Kajola would produce wagons and coatches and later locomotives, adding this would reduce import of the equipment from China.
He said: “So, as part of the benefits, the company will build a factory in Kajola.”
On the slow pace of the rail project, the minister linked it to insufficient funds and the absence of a cabinet to approve the payment.
The News Agency of Nigeria reports that the 157 kilometre Lagos-Ibadan rail project was awarded in 2017 to the Chinese Civil Engineering Construction Company at the cost of 1.6 billion Dollars with a three-year completion agreement.
As at May, the laying of the rail track had coverd 123 kilometers.
Trending
- Five candidates cleared for AfDB presidency race – Committee
- EFCC docks lawyer over alleged N1.3b fraud
- Police arrest two for murder of woman accused of witchcraft in Borno community
- Legends lost! An era closes! A nation mourns! by Abiodun Komolafe
- President Tinubu and Baba Adebanjo: A ‘ringside’ story, by Tunde Rahman
- Court remands motorist for assaulting OYRTMA officers
- Osun LG Crisis: Why Tinubu must call Oyetola to order, by Rasaq Hamzat
- Four suspects killed as police foil kidnap on Long Bridge