The Federal Controller of Works, Lagos State, Olukorede Kesha, has announced a 40 days closure of the Island-bound lane of the Alaka-Costain-Iganmu section of Eko Bridge, beginning from Sunday.
Kesha, in a statement on Thursday in Lagos, said the announcement was made in collaboration with Lagos State Government.
She said it was as a result of damage noticed on some of the bridge components needing urgent rehabilitation.
She said that delay might compromise the integrity and structural stability of the entire bridge to endanger users.
ALSO READ:
- EFCC arraigns Jude Okoye over N1.3bn fraud
- Photo news: Tinubu attends APC NEC meeting
- At APC NEC meeting, Tinubu receives vote of confidence, pledges to work harder for Nigeria
- Newdawn Publisher’s wife for burial March 7
- IBB and his autobiography: Rather, a journey in socio-economic disservice? by Ola Emmanuel
“It should be noted that any further delay in the repairs and replacement of some of these bridge members could undermine the integrity and structural stability of the entire bridge and the consequence of this can be better imagined,” she said.
She recalled that she, alongside Governor Babajide Sanwo-Olu, during the opening of the Apongbon section of the bridge, announced that intermittent closures would be carried out as the maintenance work progressed.
She added: “This closure is to allow the contractor, Messrs Buildwell Plants and Equipment Industries Limited, carry out the necessary repairs with the aim of restoring the integrity of the bridge during the stipulated time frame.
“While the service lane leading to Iponri will be available, some alternative routes are also provided for motorists plying the route from Western Avenue and its environ.
“Motorists are advised to cooperate with the Traffic-Management Team deployed on the highway to manage traffic.”
Kesha thanked the public for understanding and the usual cooperation.