The Federal Controller of Works, Lagos State, Olukorede Kesha, has announced a 40 days closure of the Island-bound lane of the Alaka-Costain-Iganmu section of Eko Bridge, beginning from Sunday.
Kesha, in a statement on Thursday in Lagos, said the announcement was made in collaboration with Lagos State Government.
She said it was as a result of damage noticed on some of the bridge components needing urgent rehabilitation.
She said that delay might compromise the integrity and structural stability of the entire bridge to endanger users.
ALSO READ:
- Four dead, 70 vehicles burnt in fuel tanker explosion in Rivers – Police
- Navy recruits 1,486 to tackle oil theft, piracy – Minister
- Ondo 2024: Sowore’s party’s candidate emerges
- LG poll: OYSIEC apologises for lateness, speaks on alternative to voter card
- Breaking: Olukoyede restructures EFCC, appoints CoS, Zonal Directors
“It should be noted that any further delay in the repairs and replacement of some of these bridge members could undermine the integrity and structural stability of the entire bridge and the consequence of this can be better imagined,” she said.
She recalled that she, alongside Governor Babajide Sanwo-Olu, during the opening of the Apongbon section of the bridge, announced that intermittent closures would be carried out as the maintenance work progressed.
She added: “This closure is to allow the contractor, Messrs Buildwell Plants and Equipment Industries Limited, carry out the necessary repairs with the aim of restoring the integrity of the bridge during the stipulated time frame.
“While the service lane leading to Iponri will be available, some alternative routes are also provided for motorists plying the route from Western Avenue and its environ.
“Motorists are advised to cooperate with the Traffic-Management Team deployed on the highway to manage traffic.”
Kesha thanked the public for understanding and the usual cooperation.