The Lagos State Building Control Authority (LASBCA) has made a shocking revelation before an Ikeja Coroner’s Court, claiming that late Femi Osibona, the Managing Director of Fourscore Heights Limited, prevented its officers from gaining access to the construction site of the collapsed 21-storey building.
An Assistant Director in charge of Inspectorate of Quality Control in the agency, Oluseun Randle, made the revelation on Friday.
Randle said she was the officer overseeing Eti-Osa, Victoria, Island, Surulere, Yaba, Lagos Mainland and Ikoyi, the area where the collapsed 21-storey building was located.
The witness noted that one of the duties of LABSCA was identification and possible removal of non-conforming structures in Lagos State.
She made the revelation while being cross-examined by Ola Adeosun, counsel to Prowess Engineering Nigeria Limited, the structural engineering consultant to Osibona, who withdrew its services over a dispute on how the project was structurally executed.
The witness said to the best of her knowledge, LASBCA had visited the site of the building collapse to check the level of compliance on three occasions.
Randle told the Coroner: “An officer first visited on February 13, 2019.
“He peered through a small opening in the gate and observed piling equipment.
“He moved closer to observe the piling operation and to gain access to the premises.
“The security operatives manning the premises did not allow him entry.
“He was only asked to wait outside of the gate for the developer (Osibona).
“After some minutes, the developer came and the officer told him he wanted to serve a notice.
“He (Osibona) told him that he could not go in and if tried to forcefully gain entry, he would tell the security to release dogs.
“The monitoring officer served a Contravention Notice and Stop Work Order dated February 13, 2019 on the structure.
“The notice and order is to be complied with within 48 hours.”
The witness said the LASBCA officer returned to the site for the second time on February 21, 2019 and pasted a Seal Up Notice on the fence and left.
On the second visit, she said the monitoring officer did not observe any construction work on the site except for the locked gate.
Randle said sometime in June 2019, LASBCA received a notification from a sister agency: Lagos State Physical Planning Permit Authority, over a permit given to Fourscore Heights Limited.
She said: “The approval drawing was for three blocks of 15 floors.
“With that (the permit) LASBCA had a reprieve over the matter.”
The LASBCA Assistant Director noted that for the rest of 2019, officers of the agency did not observe any construction work at the site except for the locked gate.
Randle said she did not know if it was possible for an individual to forge a LASBCA approval document.
She also could not recall if a developer had ever forged LASBCA documents.
Questioning Randle further, Adeosun said: “As at February 2020, two 15-storey structures were already standing on the site before the COVID-19 lockdown.
“The construction of the third building, which was the one that collapsed, was already at the third floor stage.
“Would you be surprised?”
Responding, she said: “I will be surprised.”
While being cross-examined by Ahmed Gbadamosi, a counsel to the family of Samuel Iwelu, one of the victims of the building collapse, the witness revealed that Osibona was arrested on June 10, 2020.
Randle added: “He was arrested alongside his wife and staff for contravening certification and planning laws.
“They were arrested by a joint enforcement team of LASCA and LASPPPA.
“The security men at the gate put up an attitude by resisting the team’s access to the property.
“He was found to be in contravention of the law.”
On his enquiry about events that transpired after Osibona’s arrest, Randle told Gbadamosi to make his enquiry via correspondence to the General Manager of LABSCA.
Gbadamosi noted that in Paragraph 27 of Randle’s Statement on Oath to the Coroner’s Court, she said Osibona had continued construction on the property until it collapsed on November 1, 2021.
He then asked series of questions: “Was this particular developer beyond the control of your agency?
“Why was the developer who was arrested by the task force taken to an unknown location by the police only to go back to continue developing the property?”
Randle responded: “No developer is beyond LASBCA.
“The agency was not aware that he went back to the site.
“It was the report of the collapse of the 21-storey building that gave us an insight on the height and type of the structure at the time of the collapse.”
Responding to questions from Yusuf Lawan, the counsel to the Standards Organisation of Nigeria, Randle said LABSCA was unaware that Osibona had returned to the construction site after his arrest.
She said: “The monitoring officers were not going to the site because of the COVID-19 lockdown.
“Then #EndSARS occurred.
“All our monitoring officers fell under the category of those asked to stay at home.”
The three high-rise buildings: Blocks A, B and C, were situated on Gerard Road, Ikoyi, Lagos.
Block B, which was 21-storeys, collapsed on November 1, 2021, killing 46 persons, while 15 were rescued.
One of the deceased was Osibona.