The Lagos State Government has announced the temporary closure of Akanni Doherty Street, Ashade from June 28 to 30, 2019 as part of the construction process for the ongoing Nigerian Railway Modernisation Project.
In a statement signed by the Permanent Secretary, Ministry of Transportation, Dr. Taiwo Olufemi Salaam, the closure is to allow the contractors of the project, CCECC Nigeria Limited and Devine Gate LTD, relocate and interconnect the 700m diameter public water mains along the route.
It explained further that the exercise will also involve excavation across the specified road, as well as laying of High-Density Polyethylene pipes, backfilling and compaction.
The statement, therefore, advised all motorists and the general public to use alternative routes around the area in order to ensure hitch-free traffic.
Trending
- Abuja school reacts to viral video of student being bullied
- Gov. Otu inaugurates EMT, rolls out terms of engagement
- 2023: Peter Obi and I never believed in ideologies of Labour Party — Doyin Okupe
- Breaking: Ex-Imo State Governor resigns from PDP
- Imperative of independent pre-acquisition audits for OOH campaigns, by Philip Odiakose
- Ondo 2024: APC will lose if primary is not cancelled, says former speaker
- Primate Ayodele tackles IGP: Nigeria ripe for state policing
- Again, Dangote further crashes diesel, aviation fuel prices