The Eagle OnlineThe Eagle Online
  • Home
  • News
  • Sport
  • Politics
  • Column
  • Business
  • Life & Style
    • Crime
    • R&D Health
    • Diet and Fitness
    • Intimacy
  • Entertainment
    • Photos
    • Fashion
    • Movies
    • Music
  • Videos
Facebook Twitter Instagram
Trending
  • I have no friction with Buhari, Tinubu tells APC supporters in Zamfara
  • Osun tribunal verdict: Ogun APC says Adeleke’s touted ‘secret of winning’ exposed
  • 2003: Lagos reacts to political shooting, vows it won’t condone violence 
  • Sanwo-Olu harps on training as NUJ opens remodelled secretariat
  • 2023: Group calls police to investigate deadly political violence in Lagos 
  • Gunmen attack House of Reps spokesperson’s constituency office in Abia
  • Iheanacho goal sends Leicester through to FA Cup fifth round
  • Aryna Sabalenka defeats Elena Rybakina to win Australian Open
Facebook Twitter Instagram
The Eagle OnlineThe Eagle Online
  • Home
  • News
  • Sport
  • Politics
  • Column
  • Business
  • Life & Style
    • Crime
    • R&D Health
    • Diet and Fitness
    • Intimacy
  • Entertainment
    • Photos
    • Fashion
    • Movies
    • Music
  • Videos
The Eagle OnlineThe Eagle Online
Home»Business»TCN explains low power supply in Ikeja West-Papalanto axis of Lagos
Business

TCN explains low power supply in Ikeja West-Papalanto axis of Lagos

The Eagle OnlineBy The Eagle OnlineOctober 29, 2021No Comments
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Transmission Company of Nigeria (TCN) says it is still changing the old overloaded 132 Kilo Volt (KV) Ikeja West-Alimoso-Ogba-Alausa-Ota-Papalanto 240 Mega Watts (MW) transmission.

TCN said the changing of the overload was in line with a new high capacity 500MW transmission line to solve the problem of poor power supply in Ikeja West/Papalanto axis of Lagos State.

TCN’s General Manager, Public Affairs, Mrs Ndidi Mbah, said this in a statement in Abuja on Thursday.

Mbah said presently the five power stations along that line route have a total capacity of 570MW but are only able to deliver 240MW because of the old undersized transmission line.

“As the area continues to experience continued increase in human population and socio-economic activities, the demand for electricity will continue to grow, and if the line is left without upgrade, electricity supply will soon become impossible in the area.

“TCN had to take the hard decision of reconductoring the old 132kV transmission line,” she said.

Mbah said that bearing in mind the importance of power supply, TCN is carrying out the line replacement work from 8 a.m to 5 p.m daily.

According to her, light is restored by 6 p.m to 8 a.m daily. This is estimated to last for another four weeks from now.

“We sincerely apologise for every inconvenience and solicit the support and understanding of the Lagos State governor and electricity consumers in the affected areas, to enable the successful completion of this project, which when completed will greatly improve power supply through our substations in Ikeja West-Papalanto axis of the state,” she said.

Ikeja West-Alimoso-Ogba-Alausa-Ota-Papalanto Transmission Company of Nigeria (TCN)
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
The Eagle Online

Related Posts

FG links worsening fuel scarcity to cross-border smuggling

January 28, 2023

PoS operators make brisk business, surcharge for new naira notes

January 28, 2023

New naira notes: ASSBIFI worries over members’ safety, health

January 28, 2023
© 2023 The Eagle Online.
  • Home
  • Privacy Policy
  • Advert Rates
  • Submit News
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.