• Home
  • Privacy Policy
  • Ad Rates
  • Submit News
  • Contact Us
The Eagle Online
  • Home
  • News
  • Sport
  • Politics
  • Column
  • Business
  • Life & Style
    • Crime
    • R&D Health
    • Diet and Fitness
    • Intimacy
  • Entertainment
    • Photos
    • Fashion
    • Movies
    • Music
  • Advert Rates
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Sport
  • Politics
  • Column
  • Business
  • Life & Style
    • Crime
    • R&D Health
    • Diet and Fitness
    • Intimacy
  • Entertainment
    • Photos
    • Fashion
    • Movies
    • Music
  • Advert Rates
  • Contact Us
No Result
View All Result
The Eagle Online
No Result
View All Result

FG to shut down Third Mainland Bridge 72 hours, partially close Lagos-Ibadan Expressway 48 hours

NAN by NAN
December 22, 2020
in News
3 min read
0
FG to shut down Third Mainland Bridge 72 hours, partially close Lagos-Ibadan Expressway 48 hours
Share on FacebookShare on TwitterWhatsApp

The Federal Controller of Works Lagos,  Olukayode Popoola on Tuesday announced a 72-hour total closure of the Third Mainland Bridge to cast concrete on the expansion joints.

Popoola told the News Agency of Nigeria in Lagos that the shutdown will take effect from midnight on Saturday to midnight on Tuesday.

He added that construction works had reached the stage for casting concrete on additional three expansion joints.

“There is going to be total closure of Third Mainland Bridge in order to allow for the casting of three number expansion joints on the Island bound lane.

”The effective date of the closure will be from 12:00 midnight of 25th of December. So people will be allowed to use the Third Mainland Bridge to celebrate Christmas.

“By the time the Christmas is winding down which is 12:00 midnight, we are going to close it so that we will be able to cast the concrete on Saturday the 26th and 27th we cast again.

”And we need about 72 hours for this concrete to set. Therefore, the opening will be on the 28th December midnight, that is 72-hour closure.

“This is to prevent vibration of the bridge. If we allow vehicles to be moving on one lane, there is going to be vibrations and the concrete will not set properly,” he said.

The controller said that all the alternative routes were in good condition and traffic regulatory agencies had been deployed to effectively divert and manage traffic to avert gridlock.

He appealed to road users to cooperate with traffic regulatory agencies.

Popoola also announced a 48-hour partial closure of the Lagos-Ibadan Expressway from December 28 to December 29 to complete some work on a flyover bridge on the project.

“The contractor, Messrs Julius Berger wants to install cross beams at Kilometre 16, that is, around MFM,” he said.

He explained that the piers were already standing on both sides of the road and the contractor was to lay the cross beam on top across the road.

“That area will be cordoned off, there will be closure within that section from 12:00pm on 28th of December and it will be opened to traffic by 5:00am the following day.

” 200 meters to get to that particular location we have diversion and another diversion 200 meters away from that place.

“One lane will be opened to traffic, it is only one lane we are closing to traffic at a time. The first lane that we are going to close is outward Lagos, that is the Ibadan bound carriageway, we will close it on the 28th.

RelatedPosts

Three suspected kidnappers arrested on Lagos-Ibadan Expressway

Bridge encroachers: Fashola gives eviction notice extension

Lagos-Ibadan Expressway gridlock: Passengers trek long distances to reach destinations

” And then the second day which is 29th, we are moving to the other lane which is inward Lagos. The same 12:00pm to 5:00am,” Popoola said.

He appealed for patience and understanding of road users saying that the construction was part of the progress that the Federal Government had achieved on the project.

“We regret all the inconvenience and hardship this might have created,” he said.

He said that all the construction zones had been cleared and the highway had been opened to traffic which was responsible to seamless movement on the road.

NAN reports that the Third Mainland Bridge in Lagos, which was going through series of repairs, had to be partially shut on July 24 for another round of rehabilitation works.

The repair expected to last six months was extended by one month due to the recent #EndSARS protests in Lagos extending the completion date from January 2021 to February.

The construction was initially divided into two phases of three months on each carriageway, starting with the Oworonsoki bound carriageway whose completion dragged to four months.

Traffic was partially diverted on a stretch of 3.5km where construction is ongoing between Adeniji Adele Ramp and Ebute Meta, while different time belts were allotted for traffic diversions on the bridge.

The 11.8km bridge is the longest of the three bridges connecting Lagos Island to the Mainland.

The bridge starts from Oworonshoki, which is linked to the Apapa-Oshodi Expressway and the Lagos-Ibadan Expressway and ends at the Adeniji Adele Interchange on Lagos Island.

Constructed in 1990, the bridge was adjudged as the longest in Africa until 1996 when the October 6 Bridge in Cairo, Egypt was completed.

The reconstruction/rehabilitation of the Lagos-Ibadan Expressway on the other hand was flagged off in 2013 by former President Goodluck Jonathan and was awarded to two firms.

Julius Berger is constructing section one which spans from Ojota in Lagos to Sagamu Interchange while RCC is working from the Sagamu Interchange to Ibadan.

Tags: Apapa-Oshodi ExpresswayFormer President Goodluck JonathanLagos-Ibadan ExpresswayOlukayode PopoolaThird Mainland Bridge
Share29Tweet18SendShare7

Related Posts

After assassination of Lecturer, Ogun Police warn against driving unregistered cars, cycles

Three suspected kidnappers arrested on Lagos-Ibadan Expressway

April 13, 2021
Bridge encroachers: Fashola gives eviction notice extension

Bridge encroachers: Fashola gives eviction notice extension

April 4, 2021
Lagos closes Lagos-Ibadan Expressway for pedestrian bridge construction

Lagos-Ibadan Expressway gridlock: Passengers trek long distances to reach destinations

March 27, 2021
#ENDSARS, police impunity and Nero’s guitar, by Festus Adedayo

James Ibori, Lagos/Ibadan Expressway and FG’s tortoise wisdom, by Festus Adedayo

March 21, 2021
Ibori’s loot: Ajulo tackles Delta Government, demands Sagay’s sack

Ibori’s loot: Ajulo tackles Delta Government, demands Sagay’s sack

March 16, 2021
Eight burnt to death in Lagos-Ibadan Expressway accident

One dies, one injured in Lagos-Ibadan Expressway multiple crash

March 14, 2021

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.




COVID-19 Update

Perez voted in for sixth term as president of Real Madrid

COVID-19: NCDC announces new cases, total now 163,837

HP seizes over 4.5m counterfeit print products, components globally in 2020

Editors’ guild seeks bailout for media industry

FAAN tasks airport users on COVID-19 protocols

Most Read

  • Gunmen kill policeman  accompanying election results in Ogun

    FG warns of planned attacks in six airports

    194 shares
    Share 78 Tweet 49
  • Osun: Suspected ritualist kills food vendor, severs hands, head

    155 shares
    Share 62 Tweet 39
  • Three suspected kidnappers arrested on Lagos-Ibadan Expressway

    128 shares
    Share 51 Tweet 32
  • Police reject N500,000 bribe, arrest suspects with stolen construction materials

    122 shares
    Share 49 Tweet 31
  • Police begin search for community chief, 10 others over threat to life

    120 shares
    Share 48 Tweet 30
  • Two women arrested over death of 64-year-old man in Lagos

    158 shares
    Share 63 Tweet 40

Ease Slash

Subscribe to Our Newsletter

Check your inbox or spam folder to confirm your subscription.




https://theeagleonline.com.ng/wp-content/uploads/2020/05/VID-20200510-WA0000.mp4

Chat with us now

Most Commented

  • 38-year-old girlfriend aborts pregnancy for 50-year-old man, dies

    38-year-old girlfriend aborts pregnancy for 50-year-old man, dies

    107 shares
    Share 43 Tweet 27
  • Gov. Zulum, man of strong character amid daunting security challenges — Oyetola

    68 shares
    Share 27 Tweet 17
  • We have critical security situation in South East, South South – I-G

    68 shares
    Share 27 Tweet 17
  • Ramadan: APC distributes 130 trucks of food items in Zamfara

    69 shares
    Share 28 Tweet 17
  • Dozens of bandits neutralised in air strike in Kaduna

    68 shares
    Share 27 Tweet 17

Latest

Gunmen kill one, abduct ex-Commissioner’s children, NSCDC personnel in Zamfara

Afaka abduction: NAKASS calls for release of remaining 29 students

April 13, 2021
Ramadan: Ex-Governor Ahmed solicits prayers for Nigeria’s harmony and prosperity.

Ramadan: Ex-Governor Ahmed solicits prayers for Nigeria’s harmony and prosperity.

April 13, 2021
Nurses embark on strike in Ogun over alleged kidnap of members

Nurses embark on strike in Ogun over alleged kidnap of members

April 13, 2021
Hostility: Ghana extends olive branch to Nigeria

Stakeholders seek reforms in TV content space

April 13, 2021
Airtel’s Segun Ogunsanya named Industry Personality of the Year

ScholarX, Airtel partner to launch mobile learning platform

April 13, 2021




  • Home
  • News
  • Sport
  • Politics
  • Column
  • Business
  • Life & Style
  • Entertainment
  • Advert Rates
  • Contact Us

© 2020 Premium Eagle Media Limited.

No Result
View All Result
  • Home
  • News
  • Sport
  • Politics
  • Column
  • Business
  • Life & Style
    • Crime
    • R&D Health
    • Diet and Fitness
    • Intimacy
  • Entertainment
    • Photos
    • Fashion
    • Movies
    • Music
  • Advert Rates
  • Contact Us

© 2020 Premium Eagle Media Limited.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.