• Home
  • News
  • Sport
  • Politics
  • Column
  • Business
  • Life & Style
    • Crime
    • R&D Health
    • Diet and Fitness
    • Intimacy
  • Entertainment
    • Photos
    • Fashion
    • Movies
    • Music
  • Videos
Facebook Twitter Instagram
Trending
  • Lagos 2023: We’ll invite IPOB to protect us, Igbo Leader threatens + Video
  • OBIdient against Tinubu’s inauguration evacuated from plane + Video
  • Ashok Leyland along with national distributor Stallion Motors launch Phoenix
  • Police arrest Portable after 72 hours stand-off
  • It’s my reelection gift, Sanwo-Olu says as he inaugurates newly upgraded Oba Sekumade road
  • Ahmed Musa pumps Eaglets’ spirit with pledge of N.5m per goal in Algeria 2023
  • Royal Queens host inaugural Conference, deliberate on national development
  • Osimhen doubtful for Milan Champions League clash
Facebook Twitter Instagram
The Eagle OnlineThe Eagle Online
  • Home
  • News
  • Sport
  • Politics
  • Column
  • Business
  • Life & Style
    • Crime
    • R&D Health
    • Diet and Fitness
    • Intimacy
  • Entertainment
    • Photos
    • Fashion
    • Movies
    • Music
  • Videos
The Eagle OnlineThe Eagle Online
Home»Business»Despite defect in new Abuja airport terminal building, NAMA begins equipment upgrading
Business

Despite defect in new Abuja airport terminal building, NAMA begins equipment upgrading

The Eagle OnlineBy The Eagle OnlineDecember 21, 2018Updated:December 21, 2018No Comments
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The Nigerian Airspace Management Agency has commenced the upgrade of its Instrument Landing System at the Nnamdi Azikiwe International Airport, Abuja to Category 3.
Fola Akinkuotu, NAMA Managing Director, in an interview with the News Agency of Nigeria in Abuja, said the move was to support the newly inaugurated international terminal.
Akinkuotu said the CAT3 ILS would improve the capability to land airplanes in very poor visibility, adding that the new terminal had avenue for expansion.
The managing director said increased traffic means more airplanes would come in “and so we have to provide more manpower in terms of air traffic controllers.
“We are planning to improve and actually, we are close to achieving a higher level landing navigational aid in Abuja in anticipation of the new international terminal.
“Except for some bureaucratic bottleneck, we should have had a Category 3 landing system here, which will improve our capability to land airplanes in very poor visibility, rather than we have right now.
“To a good extent, we have foreseen the possibilities that we are seeing today and we will be able to match whatever are the demands.
“Approval has been given, contracts have been awarded and construction has started for the installation of the Category 3 landing system and I think before the end of January, it will be ready.
“We are planning this category of ILS on Lagos and Abuja airports for a start and the next point of call will be Kano.”
Akinkuotu said all the stakeholders in the airport had been sensitised and were prepared to improve their capabilities to meet up with the demands of the CAT3 ILS.
He explained that the Federal Airports Authority of Nigeria would have to ensure uninterrupted power supply within the airport, while airlines had to equip their aircraft and train their pilots.
According to him, the pilots would have to be properly trained for low visibility approaches and approach light would have to meet Category 3.
He said that mobile control tower had been deployed to enable air traffic controller to be able to have visible access to both ends of the runway pending when new control tower was built.
He explained that the concept and design of the terminal building had some flaws, which made it difficult for the control tower to have a complete aerial view of the two end of runway.
Akinkuotu said: “This will be fixed in medium term because with the adjustment of the master plan, we will achieve that.
“However, since it is a necessity, we provided a mobile tower.
“NAMA will continue to improve on the services that it provides and we want to achieve our Category 3 ILS in major airports in 2019 and improve our aeronautical information system.”
NAN recalls that President Muhammadu Buhari on Thursday inaugurated the 15 million passenger capacity terminal constructed by the China Civil Engineering Construction Corporation.
The terminal at Abuja airport is one of the four new ones being constructed at the cost of $600 million under the $500 million loan from China-Exim Bank and $100 million counterpart funding from the Federal Government.
The others are in Lagos, Port Harcourt and Kano.
The Port Harcourt terminal was inaugurated by Buhari in October while the remaining two are expected to be ready for use in 2019.
abuja Fola Akinkuotu NAMA Nnamdi Azikiwe International Airport
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
The Eagle Online

Related Posts

Lagos 2023: We’ll invite IPOB to protect us, Igbo Leader threatens + Video

April 1, 2023

OBIdient against Tinubu’s inauguration evacuated from plane + Video

April 1, 2023

Ashok Leyland along with national distributor Stallion Motors launch Phoenix

March 31, 2023
© 2023 All Rights Reserved. The Eagle Online.
  • Home
  • Privacy Policy
  • Advert Rates
  • Submit News
  • Contact Us

Type above and press Enter to search. Press Esc to cancel.